|
|||||
|
Industrial Road to be temporarily closed Industrial Road will be closed to all traffic from Clolinger to Depot Road, with the exception of the J1/J3 shuttles to converting and the trailer yard June 11-16 for the tie-in of the new overpass.
Trucks should use the Highway 177 entrance at the water plant and turn at the Jackson Sawmill exit.
|
|||||